0819-0808-0450 humas@irps.or.id

Tracing Banjar-Cijulang Inactive Line

On July 4, 2009 IRPS traced the inactive Banjar-Cijulang railway line.  It had been 24 years since the last train sped majestically on the line. The line, which was a branch line of Bandung-Yogyakarta main line, was an outstanding work of engineering.  There were four...