18 - October - 2009

A Report on Citayam-Nambo Line Inspection and Maintenance

Filed under: DAOP 1, Jakarta, Object, Observation, Station — admin @ 07:31

The event was held on 18th October 2009 in which PT Kereta Api, IRPS, Kompak, GM-MarKA, and KRL-Mania participated. Acting as a coordinator was Slamet Haryadi of Jakarta branch of IRPS. First the team assembled a motorised draisine to carry railway company’s grass cutting tools. Then the draisine moved eastward from Cibinong Station to Nambo Station. At the location, a part of the team started to cut tall grass growing wild along the rail line, meanwhile the draisine returned to Cibinong to pick up waiting railfans.

(Read the rest of this entry »)