1 - January - 2006

investigate the history of Kedung Jati – Tuntang – Ambarawa railway track

Filed under: Cinta Kereta Api, DAOP 4, Pembelajaran dan Eksplorasi — admin @ 11:51

in January 1, 2006, IRPS organized a investigate the history of railway between Kedung Jati, Tuntang and Ambarawa

Pandanwangi train set (Semarang – Solo railway track) leave Kedung Jati station

IRPS members in Pudjinarno’s home at Kedung Jati

Tuntang station

IRPS members departure from Tuntang station to Ambarawa station with Lorry set

IRPS members at Ambarawa station

3 Comments »


i’m very interested, i wonder if the track back to operate, especially from kedungjati to tuntang as coonector to main railway system, what is the plan?

October 20th, 2008 | 13:37

Japemethe:

I’m wondering,why do so many railways left abandoned while it had been built deep down to the remote village.If only it could be reactivated again for the sake of transportation,it will surely bring prosperity.What have we become,selling those rails for the individual interest.What a pity

January 14th, 2009 | 20:36

Japemethe:

I was wondering,why do so many railways left abandoned while it had been built to the remote village?
If it were reactivated for the sake of mass transportation,I’m definitely sure that development will even faster and better.
Most of the railways now have been burried by asphalt,pavement and building.How much loss due to the extinction of those materials?
Not to mention the land as well. What a pity?

January 15th, 2009 | 20:05


Leave a Reply

Comment